A large, empty warehouse interior with tall steel pillars, construction equipment, and a polished concrete floor.

Walmart IND3 – 27-Aisle High-Bay Storage Expansion

McCordsville, INIndustrial In progress (scheduled March 2027)

A 27-aisle high-bay storage expansion inside Walmart's fulfillment center in McCordsville, Indiana.

Twenty-seven aisles of high-bay storage inside a live facility.

IND3 is one of Walmart's largest fulfillment centers at 3,508,406 SF, and we added 27 aisles of full-height high-bay storage without taking anything offline. Scope included the storage structure itself with access stairs and work platforms, overhead MEP, and fire protection, all tied into the facility's existing systems.

Integration was the challenge, with new capacity connecting to live systems while the building kept operating. The project is in progress, with completion scheduled for March 2027.

Project Specifications

Scale
Within a 3,508,406 SF facility
Building Systems
Full-height storage structure with access stairs and work platforms; overhead MEP; fire protection
Site Conditions
Integration with existing systems inside an operating fulfillment center

Related Projects

View All Projects about Related Projects

Tell us what you're building.