Volkswagen of America – Flexible Usage Buffer
A 15,000 GSF elevated conveyor tunnel connecting paint to assembly, built 60 feet above an operating Volkswagen plant.
Emergency demolition and reconstruction of a storm-damaged Walmart distribution center in Sanger, Texas.
Major storm damage hit an operating Walmart distribution center in Sanger, Texas. The building needed emergency demolition and reconstruction, with the structural steel, roofing, and exterior envelope all replaced.
The center could not stop shipping, so every phase was coordinated with Walmart facility personnel to keep operations moving around the work. This high-profile project was delivered in 2026 while meeting Walmart's critical schedule and budget objectives.
A 15,000 GSF elevated conveyor tunnel connecting paint to assembly, built 60 feet above an operating Volkswagen plant.
A standalone EV battery testing facility for Volkswagen's North American EV program.
Construction management for a body shop expansion and a standalone EV battery assembly and storage facility on Volkswagen's Chattanooga campus.