Walmart DC 6068 – Storm Damage Reconstruction
Emergency demolition and reconstruction of a storm-damaged Walmart distribution center in Sanger, Texas.
Construction management for Hankook Tire: schematic design, bridging documents, and cost estimating.
Hankook Tire planned a second phase of construction at its Clarksville plant, with 903,154 GSF across the main plant and eleven subsidiary buildings. Before committing, the owner needed cost certainty. We managed the schematic design and bridging documents and ran the cost estimating that turned a program into a number the owner could stand behind.
Value engineering across the twelve buildings delivered $32.36M in optimized savings, including $26M from optimized square footage, and landed the program at $173 per square foot total cost. The engagement was completed in 2022.
Emergency demolition and reconstruction of a storm-damaged Walmart distribution center in Sanger, Texas.
A 15,000 GSF elevated conveyor tunnel connecting paint to assembly, built 60 feet above an operating Volkswagen plant.
A standalone EV battery testing facility for Volkswagen's North American EV program.